Free visitthen a written price before any work starts
California license CSLB C-10 #1139608
Permit & inspection handled
Written price after a free visit
5-year labor warranty
Free visit
Get a written price for your build
Tell us about the project and where it is. We call back to set up a free visit and look at the plans.
Electrical for new homes, additions and ADUs — from the service and rough-in to the finished lighting — coordinated with your builder, permitted and inspected.
New construction runs on the builder's schedule, and the electrical has to keep up: the service and the temporary power, rough-in before insulation, the inspections, then the devices and the lighting at the end. We plan it with you or your builder from the plans and turn up when the job needs us.
We've done lighting throughout a custom home in Santa Rosa — see the project — and we wire additions and ADUs to the same standard, with the permit pulled under our license.
What it costs in Northern California
We don't quote California work from a price list. For planned work — a panel, a charger, a remodel — someone from our Northern California crew comes out, looks at the panel, the service and the route the wiring has to take, and you get a fixed price in writing before any work starts. That visit is free and there is no obligation. Repairs are priced before the repair is done.
Written price after a free visit. No obligation, and nothing starts until you have the number in writing.
Free written estimate
10% off for veterans & active military
Who this is for
You're building a new home or a custom home
You're adding an ADU or a garage conversion
You're building an addition that needs its own circuits or subpanel
Your builder needs an electrical subcontractor
What's included
Service, meter and main panel
Rough-in and trim-out
Kitchen, bath and laundry circuits
Interior, exterior and landscape lighting
EV-ready circuits and conduit
ADU subpanels and separate services
Smoke and CO alarms
Permits and inspections at every stage
New construction in California
The Energy Code shapes the wiring
New California homes are built to the Energy Code (Title 24, Part 6), which sets lighting and control requirements and, for many homes, solar-ready and electric-ready provisions. We read the energy compliance documents with the plans.
ADUs and the utility
An ADU can be fed from the main house's panel or get its own service; which one works depends on the load and on the utility — PG&E, SMUD or Roseville Electric. We sort it out before the trench is dug.
Answers
New Home Wiring FAQ
01Do you work as a subcontractor for builders?
Yes — we work from the builder's plans and schedule, pull the electrical permit under our license, CSLB C-10 #1139608, and book our own inspections.
02Can an ADU share the main house's panel?
Often, if the load calculation allows it; otherwise it needs a larger service or its own. We work it out from the plans before pricing.
03How is new construction priced?
In writing, from the plans, after a free visit to the site.
Northern California
New Home Wiring in Northern California
Call, or send the form for a free visit and a written price.