Electrical Panel Upgrade & Replacement in Northern California
Free visitthen a written price before any work starts
California license CSLB C-10 #1139608
Permit & inspection handled
Written price after a free visit
5-year labor warranty
Free visit
Get a written price for your panel
Tell us where the house is and what's going on with the panel. We call back to set up a free visit.
Panel replacements and 100A-to-200A service upgrades in the Sacramento area, the Bay Area and the North Bay — Zinsco and Federal Pacific swaps included — with the permit, the inspection and the utility handled.
A panel is worth replacing when it can't carry what the house now asks of it — an EV charger, a heat pump, an induction range, a spa — or when it is a make with a poor record, such as Zinsco or Federal Pacific Stab-Lok. Sometimes the panel itself is fine and only the service needs to grow; sometimes both do. We look before we say which.
A panel change in California is permitted work. We pull the permit under our C-10 license, coordinate the shut-off and the reconnect with your utility — PG&E, SMUD or Roseville Electric — and meet the inspector. You end up with a labelled, code-compliant panel, a signed-off permit and our 5-year labor warranty in writing — and the price for all of it in writing before we start.
What it costs in Northern California
We don't quote California work from a price list. For planned work — a panel, a charger, a remodel — someone from our Northern California crew comes out, looks at the panel, the service and the route the wiring has to take, and you get a fixed price in writing before any work starts. That visit is free and there is no obligation. Repairs are priced before the repair is done.
Written price after a free visit. No obligation, and nothing starts until you have the number in writing.
Free written estimate
10% off for veterans & active military
Who this is for
Your panel is a Zinsco or a Federal Pacific Stab-Lok
You're adding an EV charger, a heat pump or a spa and the panel is full
Breakers trip again and again, or the panel feels warm
A home inspector or your insurer has flagged the panel
What's included
Panel replacement, same size or larger
100A to 200A service upgrades
Zinsco and Federal Pacific replacement
Meter and service-entrance work to the utility's rules
Subpanels for a garage, shop or ADU
Load calculation before anything is ordered
Every circuit labelled
Permit pulled, inspection met
Panel work in California — what's different
Your utility sets part of the schedule
A service change needs the utility to disconnect and reconnect the power. PG&E covers the Bay Area and the North Bay, SMUD most of Sacramento County, and Roseville Electric the city of Roseville — each with its own application and lead time. We file it and plan the day around it.
PG&E's Greenbook
In PG&E territory the meter and the service equipment have to meet PG&E's Greenbook — height, clearances, where the service may enter. A panel that has to move or grow is laid out to it before anything is ordered.
Smoke and CO alarms
When permitted work on a home costs more than $1,000, California requires working smoke alarms, and carbon monoxide alarms where there is a gas appliance or an attached garage. Inspectors check for them on a panel job, so we check first.
Answers
Panel Upgrades & Replacement FAQ
01How much does a panel upgrade cost in Northern California?
It depends on whether only the panel changes or the service grows too, on where the meter is and on what your utility requires. We don't guess: after a free visit you get a fixed price in writing, covering the permit and the inspection, before any work starts.
02Do I need a permit to replace a panel in California?
Yes. The city — or, outside city limits, the county — issues the permit and sends an inspector. We pull it under our license, CSLB C-10 #1139608, and meet the inspector.
03Should I replace a Zinsco or Federal Pacific panel?
They are the two panel makes most often recommended for replacement because of how their breakers have performed. If yours is one of them, we'll look at it on the free visit and tell you plainly what we see.
04How long will the power be off?
For a straight panel replacement, usually most of one working day. A service upgrade depends on the utility's disconnect and reconnect, which we schedule with them in advance and tell you about up front.
05Can I get an EV charger without upgrading the panel?
Often, yes. A load calculation shows what the panel can still carry, and a load-management device can share capacity between the charger and the rest of the house. See EV charger installation.
Northern California
Panel Upgrades & Replacement in Northern California
Call, or send the form for a free visit and a written price.