Licensed & Insured · OR CCB #244602
Federal Pacific & Zinsco Panel Replacement in Portland, OR
$2,800 – $3,200 Typical FPE or Zinsco swap
- Licensed & insured in OR, WA & CA
- Same-day & 24/7 service
- Permit & inspection included
- 5-year labor warranty
- 5.0 on Google
Free estimate
What will your panel swap cost?
Tell us the brand on the panel label if you can see it. We confirm it on a free visit and give you a written price — no obligation.
Federal Pacific Stab-Lok or Zinsco panel in the house? We take it out and put in a new breaker panel — permit, inspection and utility coordination included — so the replacement is on record when your insurer or a buyer's inspector asks.
Federal Pacific (FPE) Stab-Lok and Zinsco (also sold as Sylvania-Zinsco) panels were installed in a lot of Portland and Clark County homes from the 1950s into the 1980s. Both brands have a long, widely documented history of breakers that may not trip when they should, which is the whole job of a breaker. That is why home inspectors flag them, and why some insurers ask for the panel to be replaced before they write or renew a policy.
How to tell: open the panel door and look at the label and the breakers. "Federal Pacific Electric", "FPE" or "Stab-Lok" printed on the label or breakers means FPE. "Zinsco" or "Sylvania" on the label — often with brightly colored breaker handles — means Zinsco. Not sure? Text us a photo of the label and we'll tell you.
Replacing one is a standard panel replacement: the old panel and breakers come out, a new panel and breakers go in, every circuit is tested and relabeled, and grounding and bonding are brought up to code. If you also need more capacity for an EV charger, heat pump or hot tub, we can upgrade the service to 200 amps in the same visit.
Need more capacity, not just a new panel? Panel upgrades & 100A → 200A service →
What an FPE or Zinsco panel replacement costs
$2,800 – $3,200 A typical Federal Pacific or Zinsco panel swap — new panel and breakers, grounding to code, permit and inspection included
-
Federal Pacific or Zinsco panel swap $2,800 – $3,200
New panel and breakers in the same spot, grounding and bonding brought to code, every circuit labeled. Permit and inspection included.
-
Swap + 100A → 200A service upgrade $5,100 – $6,800
New 200A panel and main plus new service wires and meter socket — and a new mast and weatherhead where the old ones are worn out. Permit and inspection included.
-
Swap with panel relocation From $7,700
The new panel goes in a new spot, often outside, and every circuit is re-routed to it. Priced after a site visit.
Permit and inspection are part of the job — we bill $350 – $750 depending on jurisdiction and scope. (The City of Portland fee alone is $212 plus Oregon's 12% surcharge; Washington L&I is $109.90 for a 0–200A service change.)
These ranges are a starting point, not a quote. The exact price for your job can only be set after we talk it through — call or send the form and you’ll have it as a free written estimate before any work starts.
These are our current typical prices, permit and inspection included. Relocations and anything unusual are priced individually after a site visit.
- Free written estimate
- 10% off for veterans & active military
Who this is for
The panel label or breakers say Federal Pacific, FPE or Stab-Lok
The panel says Zinsco or Sylvania-Zinsco
Your home inspector or insurer flagged the panel
You're buying or selling a home and the panel came up in the inspection
What's included
- Old FPE or Zinsco panel and breakers removed
- New breaker panel and breakers installed
- Every circuit tested and relabeled
- Grounding and bonding brought up to code
- Permit, inspection and utility coordination included
- Upgrade to 200A in the same visit if you need it
- Licensed and insured in Oregon, Washington and California
- 5-year labor warranty in writing
Why Power Professor
What you get besides the work
5-year labor warranty
In writing, on every install. Parts keep the manufacturer's own warranty on top of it.
Permit and inspection included
We pull the permit, book the inspection and meet the inspector. It's in the price, not on top of it.
Licensed in Oregon, Washington and California
CCB #244602 in Oregon, UBI 604467072 in Washington, CSLB #1139608 in California. Fully insured, with crews based in NE Portland and in Northern California.
700+ jobs in the last two years
Seven years on Portland and Clark County electrical.
Read our Google reviewsAnswers
Federal Pacific & Zinsco Panel Replacement FAQ
01Is a Federal Pacific panel dangerous?
02What about Zinsco and Sylvania-Zinsco panels?
03How do I know if I have a Federal Pacific or Zinsco panel?
04Can I just replace the breakers instead of the panel?
05How much does it cost to replace a Federal Pacific or Zinsco panel?
06Will my insurance company require me to replace it?
07How long does a panel replacement take?
08Do I need a permit to replace my panel?
Ready for reliable power?
Still have questions? Get in touch today.
Call for immediate help or send a message for a free, no-obligation estimate.
- Free written estimate
- 10% off for veterans & active military
Coverage
Where we offer Federal Pacific & Zinsco Panel Replacement
In Northern California? Panel Upgrades & Replacement in Northern California →
Free estimate
Schedule your free estimate
Free for planned projects — panels, EV chargers, lighting, remodels. Send this and we'll call you back to set a time.









