Licensed & Insured · OR CCB #244602

Electrical Panel Upgrade & Replacement in Portland, OR

$2,800 – $3,200 Panel replacement, permit included

  • Licensed & insured in OR, WA & CA
  • Same-day & 24/7 service
  • Permit & inspection included
  • 5-year labor warranty
  • 5.0 on Google

Free estimate

Get your number, not a range

That's the typical range. Your number comes after we look at your panel — free visit, written price, no obligation.

  • Free written estimate
  • 10% off for veterans & active military

Electrical panel upgrades and replacements for Portland and Vancouver, WA homes — 100A to 200A service upgrades, Federal Pacific and Zinsco swaps, permit and inspection included, priced in writing before we start.

An undersized or aging electrical panel limits what your home can run and can be a real safety hazard. We replace panels and upgrade service capacity across the Portland metro and Clark County to handle today's loads — EV chargers, heat pumps, hot tubs, shop equipment — and we do it for the price we put in writing first. We're a licensed and insured electrical company based in NE Portland, with electrical contractors on both sides of the river.

Utility coordination, permit, and inspection are all part of the job. You're left with a clearly labeled, code-compliant 200A panel built for the next few decades, and our 5-year labor warranty in writing.

Federal Pacific, Stab-Lok or Zinsco panel? FPE & Zinsco panel replacement →

What a panel replacement or upgrade costs

$2,800 – $3,200 A typical panel replacement — new panel and breakers, grounding to code, permit and inspection included — Portland metro and Clark County

  • Panel replacement $2,800 – $3,200

    New panel and breakers in the same spot, grounding and bonding brought to code, every circuit labeled — including the usual Federal Pacific or Zinsco swap. Permit and inspection included.

  • Panel + 100A → 200A service upgrade $5,100 – $6,800

    New 200A panel and main plus new service wires and meter socket — and a new mast and weatherhead where the old ones are worn out. Utility coordination, permit and inspection included.

  • Panel upgrade with relocation From $7,700

    The panel moves to a new spot, often outside, and every circuit is re-routed to it. Priced after a site visit.

  • Subpanel for a garage, shop or ADU $1,000 – $1,500+

    Priced by feeder length and whether it has to be trenched.

  • 400A service $7,000 – $12,000+

    Large homes, shops, multiple EVs; utility transformer coordination.

Permit and inspection are part of the job — we bill $350 – $750 depending on jurisdiction and scope. (The City of Portland fee alone is $212 plus Oregon's 12% surcharge; Washington L&I is $109.90 for a 0–200A service change.)

These ranges are a starting point, not a quote. The exact price for your job can only be set after we talk it through — call or send the form and you’ll have it as a free written estimate before any work starts.

These are our current typical prices, permit and inspection included. Relocations, 400A services and anything unusual are priced individually after a site visit.

See the full 2026 cost breakdown
  • Free written estimate
  • 10% off for veterans & active military

Who this is for

Your panel is a Federal Pacific Stab-Lok or a Zinsco

You're adding a heat pump, EV charger, or hot tub and need capacity

Breakers trip repeatedly, or the panel is warm to the touch

Your insurer or home inspector has flagged the panel

What's included

  • Service & panel upgrades
  • Increased capacity
  • Utility coordination
  • Clear labeling & inspection
  • Federal Pacific & Zinsco panel replacement
  • 100A to 200A+ service upgrades
  • Meter base replacement
  • Sub-panel installation
  • Breaker & circuit relabeling

How long it takes

Recent Panel Changes & Upgrades jobs have taken 1–3 days, depending on scope. Permit and inspection scheduling is handled as part of the job and doesn't add to your timeline beyond what the utility or inspector requires.

Why Power Professor

What you get besides the work

5-year labor warranty

In writing, on every install. Parts keep the manufacturer's own warranty on top of it.

Permit and inspection included

We pull the permit, book the inspection and meet the inspector. It's in the price, not on top of it.

Licensed in Oregon, Washington and California

CCB #244602 in Oregon, UBI 604467072 in Washington, CSLB #1139608 in California. Fully insured, with crews based in NE Portland and in Northern California.

700+ jobs in the last two years

Seven years on Portland and Clark County electrical.

Read our Google reviews

Trusted by

Companies we've worked with

Google reviews

What Panel Changes & Upgrades clients say

Copied word for word from our Google Business Profiles in Portland and Vancouver.

5.0 on Google from our Portland and Vancouver profiles · Read all reviews

★★★★★
Had a pleasure working with everyone on the team. All the employees were professional, knowledgeable and completed the work on time. Would definitely hire them on my future project.
Alex ShevchukHomeowner · Vancouver, WA

Answers

Panel Changes & Upgrades FAQ

01How much does an electrical panel upgrade cost in Portland or Vancouver?
A typical panel replacement runs $2,800 – $3,200, permit and inspection included. Replacing the panel and upgrading the service from 100A to 200A — new service wires and meter socket — typically runs $5,100 – $6,800. Moving the panel to a new spot starts around $7,700. Your exact number comes in writing after a free visit.
02How do I know if my panel needs replacing?
Frequent tripped breakers, a warm panel, visible rust or scorching, or an insurer/inspector flag are all signs it's time.
03Are Federal Pacific and Zinsco panels really unsafe?
Both brands have a well-documented history of breakers failing to trip properly, and most insurers and inspectors flag them.
04Will I lose power during the upgrade?
Yes, briefly — we coordinate with the utility to minimize the outage window during the swap.
05Do you handle the utility disconnect and reconnect?
Yes, that coordination is part of the job.
06Can you upgrade my service size (e.g. 100A to 200A)?
Yes, we size the new service and panel to match your current and future load needs.
07Do I need a permit for a panel upgrade?
Yes, and we pull it and coordinate the inspection as part of the job.
08Do you replace Federal Pacific (FPE) and Zinsco panels?
Yes, and we recommend it. Federal Pacific Stab-Lok and Zinsco panels are known for breakers that fail to trip, and home inspectors in Portland and Vancouver flag them. Replacing one is a standard panel replacement — same price range as the table above — and the permit and inspection are included.
09Can you replace an old fuse box with a breaker panel?
Yes. A fuse box to breaker panel conversion is a full panel replacement: new 200-amp (or 100-amp) breaker panel, new breakers, grounding brought up to code, permit and inspection. If the service wires and meter base are undersized we'll tell you before we quote.
10What is a 200 amp service upgrade and do I need one?
A 200 amp service upgrade replaces a 100-amp (or smaller) service — panel, meter base and often the mast and service wires — with 200-amp equipment. You usually need one if you're adding an EV charger, heat pump, hot tub or shop and the existing panel is already full. We coordinate the utility disconnect with PGE, Pacific Power or Clark PUD.
11Do you install subpanels?
Yes — a subpanel in a garage, shop, ADU or addition when the main panel has capacity but no space, or the load is far from the main. Typically $1,000–$1,500+ depending on feeder length and whether it has to be trenched — see the price table above.

Ready for reliable power?

Still have questions? Get in touch today.

Call for immediate help or send a message for a free, no-obligation estimate.

  • Free written estimate
  • 10% off for veterans & active military

Recent work

Panel Changes & Upgrades projects

ResidentialSt. Helens, OR

Panel Upgrade and Weather Head Correction

Addressing electrical panel issues is not routine when water intrusion is involved. This project required both a careful upgrade and attention to moisture concerns at the weather head entering the meter main. We documented the work throughout, ensuring clear wiring, secure connections, and organized panels for safety and efficient power distribution.

View project
ResidentialGresham, OR

22 kW Whole-Home Standby Generator and Automatic Transfer Switch

A 22 kW Honeywell air-cooled standby generator, a service-entrance-rated automatic transfer switch, and underground power to the property's well pump house, added to an existing home in Gresham, Oregon, so the house, the heat pump, and the water supply all stay on when the grid goes down.

View project